<br />
<b>Notice</b>:  Undefined index: option in <b>/var/www/html/htdocs/blog.valdosta.edu/htdocs/wp-content/plugins/ldap-login-for-intranet-sites-multisite/wpldaplogin.php</b> on line <b>1770</b><br />
<br />
<b>Notice</b>:  Undefined index: option in <b>/var/www/html/htdocs/blog.valdosta.edu/htdocs/wp-content/plugins/ldap-login-for-intranet-sites-multisite/wpldaplogin.php</b> on line <b>1774</b><br />
{"id":4064,"date":"2013-06-06T16:19:00","date_gmt":"2013-06-06T16:19:00","guid":{"rendered":"http:\/\/blog.valdosta.edu\/library\/?p=4064"},"modified":"2013-06-06T16:20:00","modified_gmt":"2013-06-06T16:20:00","slug":"construction-in-odum","status":"publish","type":"post","link":"https:\/\/blog.valdosta.edu\/library\/2013\/06\/06\/construction-in-odum\/","title":{"rendered":"Renovation in Odum"},"content":{"rendered":"<p><a href=\"http:\/\/blog.valdosta.edu\/library\/wp-content\/uploads\/sites\/9\/2013\/06\/reference-construction.jpg\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/blog.valdosta.edu\/library\/wp-content\/uploads\/sites\/9\/2013\/06\/reference-construction.jpg\" alt=\"reference construction\" width=\"565\" height=\"226\" class=\"alignnone size-full wp-image-4065\" \/><\/a><br \/>\nDuring the summer, several renovation projects will be occurring in the library. On the fourth floor, the office suite of the Library Science School is being expanded. On the second floor, the Center for eLearning office suite will undergo a major makeover and, also on the second floor, the library\u00e2\u20ac\u2122s reference department office suite is being enlarged. Please \u00e2\u20ac\u0153pardon our progress\u00e2\u20ac\u009d during these projects. These projects will begin the week of June 3rd and should be completed by early August.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>During the summer, several renovation projects will be occurring in the library. On the fourth floor, the office suite of the Library Science School is being expanded. On the second floor, the Center for eLearning office suite will undergo a major makeover and, also on the second floor, the library\u00e2\u20ac\u2122s reference department office suite is [&hellip;]<\/p>\n","protected":false},"author":39,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[],"class_list":["post-4064","post","type-post","status-publish","format-standard","hentry","category-renovation"],"acf":[],"_links":{"self":[{"href":"https:\/\/blog.valdosta.edu\/library\/wp-json\/wp\/v2\/posts\/4064","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blog.valdosta.edu\/library\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blog.valdosta.edu\/library\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blog.valdosta.edu\/library\/wp-json\/wp\/v2\/users\/39"}],"replies":[{"embeddable":true,"href":"https:\/\/blog.valdosta.edu\/library\/wp-json\/wp\/v2\/comments?post=4064"}],"version-history":[{"count":4,"href":"https:\/\/blog.valdosta.edu\/library\/wp-json\/wp\/v2\/posts\/4064\/revisions"}],"predecessor-version":[{"id":4069,"href":"https:\/\/blog.valdosta.edu\/library\/wp-json\/wp\/v2\/posts\/4064\/revisions\/4069"}],"wp:attachment":[{"href":"https:\/\/blog.valdosta.edu\/library\/wp-json\/wp\/v2\/media?parent=4064"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blog.valdosta.edu\/library\/wp-json\/wp\/v2\/categories?post=4064"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blog.valdosta.edu\/library\/wp-json\/wp\/v2\/tags?post=4064"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}